What counts as right-of-way work
The approach between the sidewalk and the street, the public sidewalk, the curb, and the green strip are in the public right-of-way. In Detroit, construction there requires a permit from the Department of Public Works City Engineering Division.
Approaches and curb cuts
Installing or removing a driveway approach needs a right-of-way permit, and cutting the curb for an approach needs a separate permit. For right-of-way-only work, plans go to DPW City Engineering; for new development, curb-cut plans go with the building plans.
Construction standards
Approaches and sidewalks follow DPW’s standard specifications for paving and the street and alley standard plans. Contractor-built approaches have the contractor’s name and the year stamped into each end slab, which makes it easy to see who did the work.
Questions for your contractor
Confirm these before the pour.
- Who applies for the DPW permit, and is the fee in the estimate?
- Is a separate curb-cut permit needed?
- Is the contractor bonded with the City for right-of-way work?
- For suburbs: which city or township issues the permit?